Baichuan (Rugao) User-side Energy Storage Project

Project scale: 2MW/8.8MWh Project address: Baichuan (Rugao) New Material Chemical Park Project completion time: May 2019 Project role: The use of 6KV high voltage and 1 grid connection, with functions such as peak shaving and valley filling, dynamic demand response, reduction of main transformer demand, and optimization of power quality. At the same time, it is connected to an energy-saving platform and can be dispatched by grid companies to achieve demand-side response . Project significance: Integrating low-voltage inverters, step-up transformers, high-voltage complete sets of equipment and secondary protection equipment into a prefabricated cabin can save costs, reduce land occupation, and explore user-side energy storage technologies and application routes.
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
1
Product description
Parameters
Technical advantages
Project scale: 2MW/8.8MWh
Project address: Baichuan (Rugao) New Material Chemical Park
Project completion time: May 2019
Project role: The use of 6KV high voltage and 1 grid connection, with functions such as peak shaving and valley filling, dynamic demand response, reduction of main transformer demand, and optimization of power quality. At the same time, it is connected to an energy-saving platform and can be dispatched by grid companies to achieve demand-side response .
Project significance: Integrating low-voltage inverters, step-up transformers, high-voltage complete sets of equipment and secondary protection equipment into a prefabricated cabin can save costs, reduce land occupation, and explore user-side energy storage technologies and application routes.