海基
Language

News

Position:
Homepage
>
>
September 2018

September 2018

(Summary description)Signed a 28MWh microgrid  project with China Power Construction Group( Xinjiang), successfully to connect to the grid and run into operation in Dec.2018

September 2018

(Summary description)Signed a 28MWh microgrid  project with China Power Construction Group( Xinjiang), successfully to connect to the grid and run into operation in Dec.2018

Information

Signed a 28MWh microgrid  project with China Power Construction Group( Xinjiang), successfully to connect to the grid and run into operation in Dec.2018

Scan the QR code to read on your phone

Fax:

0510 - 88012020
E-mail:

trade@ihigee.com

 

Copyright © 2020 Jiangsu Higee Energy Co., Ltd 苏ICP备20009053号-1   Powered by:www.300.cn